The McNelson Family
Monday, July 9, 2012
Shower Preview
It's finally looking more like a shower than a construction zone. It will look a lot better after grout. So far, of the 9 surfaces in the shower plus curb, the ceiling and floor are the only two that have been grouted. I did all the baseboard around the room with the same tile as on the curb too which also needs grout. So now it's down to grouting, sealing, and installing the fixtures and then maybe consider a shower door, for now a simple rod will do.
This project was much more work than I ever imagined and plan to detail most of the main steps another time.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment